Overview  |  Markets  |  Showcase Projects  |  Clients

Showcase Projects

Hospitals
Johns Hopkins BRB
Johns Hopkins CRB

Laboratories/ R&D
Advanced Chemistry Laboratory
The Institute for Genomic Research
Human Genome Sciences
Walter Reed Army Institute of Research
The Celera Genomics Corporation
Army Physical Sciences Facility
University of Maryland Center for Advanced Research in Biotechnology

Data Centers
AOL
Verio
Digex

Office Buildings
Montgomery Business Park
Baltimore City Police Headquarters


Conference Centers
Washington D.C.
Baltimore

Hotels
Mandarin Oriental
Embassy Suites Hotel

Theatre
Frances Merrick Performing Arts Theatre (Hippodrome)

Sports/Recreation
M&T Bank Stadium
Oriole Park at Camden Yards
University of Maryland Comcast Arena

Wastewater and Water Treatment
Back River W.W.T.P.
Patapsco W.W.T.P.
Hillen Pumping Station
Ashburton Filtration Plant

Correctional Facilities
Baltimore City Juvenile Justice Center

Airports
Dulles International
BWI A/B Expansion

Showcase Projects
Oriole Park / M&T Bank Stadium

Client/Owner
The Maryland Stadium Authority

Architect/Engineer
RMF Engineering, Inc.

General Contractor
The Poole and Kent Corporation

Contract Amount
$22,389,332

The Project
The Oriole Park/M&T Bank Stadium Chilled Water and Electric Generation Project consisted of 2,700 tons of installed chiller capacity located within Oriole Park, and 13,600 ton hours of thermal storage located underground on an adjacent property. The new chilled water system handles the demands of both of both stadiums as well as the Camden Warehouse providing a single chilled water facility, and saving the Owner substantial operation costs annually.

PK Role
On this project, Poole and Kent served in dual roles as the design/build general contractor and the mechanical contractor. Poole and Kent's scope of work encompassed the following installations: approximately 2,000 trench feet of fourteen-inch welded steel distribution piping for supply and return of 40-percent glycol chilled water (which was installed primarily under streets and sidewalks to connect to M&T Bank Stadium), (2) 1,825kW diesel generators, and paralleling switchgear.

Highlights/Challenges
The Oriole Park/M&T Bank Stadium Chilled Water and Electric Generation project was a fast-track project completed within a six month period. Poole and Kent assisted the Engineer in the design layout of the new systems to accommodate the existing structure at Oriole Park, and service the expanded capacity of the integrated system that includes M&T Bank Stadium.

Back to top