Overview  |  Markets  |  Showcase Projects  |  Clients

Showcase Projects

Hospitals
Johns Hopkins BRB
Johns Hopkins CRB

Laboratories/ R&D
Advanced Chemistry Laboratory
The Institute for Genomic Research
Human Genome Sciences
Walter Reed Army Institute of Research
The Celera Genomics Corporation
Army Physical Sciences Facility
University of Maryland Center for Advanced Research in Biotechnology

Data Centers
AOL
Verio
Digex

Office Buildings
Montgomery Business Park
Baltimore City Police Headquarters


Conference Centers
Washington D.C.
Baltimore

Hotels
Mandarin Oriental
Embassy Suites Hotel

Theatre
Frances Merrick Performing Arts Theatre (Hippodrome)

Sports/Recreation
M&T Bank Stadium
Oriole Park at Camden Yards
University of Maryland Comcast Arena

Wastewater and Water Treatment
Back River W.W.T.P.
Patapsco W.W.T.P.
Hillen Pumping Station
Ashburton Filtration Plant

Correctional Facilities
Baltimore City Juvenile Justice Center

Airports
Dulles International
BWI A/B Expansion

Showcase Projects
Walter Reed Army Institute of Research

Client
U.S. Army Corps of Engineers

Location
Silver Springs, Maryland

Architect
Haines, Lundberg & Waehler

General Contractor
Manhattan Construction Company

Contract Amount
$36,800,000

The Project
The Walter Reed Army Institute of Research is a four-level structure in which the mechanical, plumbing, and electrical services on all levels support more than 120 laboratories. Both the Army and the Navy will perform research at this facility. The research laboratories are a BL-3 classification, which means the laboratory can isolate and study nearly all infectious diseases. In addition to 474,000 square feet of laboratory and administrative area, there is an interstitial space above each floor, which doubles the square footage of the building. Two large and two small animal operating rooms with ancillary spaces serve the veterinarians. These four operating rooms are the equivalent of operating rooms in regular hospitals.

PK Role
As the mechanical contractor, Poole and Kent performed the installation of the following systems/equipment: (1) 65-ton Chiller for cooling of Animal Rooms, (3) 1,100-ton Chillers, (3) 700-hp Water Tube Boilers, 100 % outside air system featuring 10 AHU’s at 78,000 CFM (avg.), medical and special gases, laboratory services including: reverse osmosis and deionized water, vacuum, compressed air, acid waste systems, animal watering system, animal flushing system, process condenser water systems, and a radioactive waste system .

Highlights/Challenges
Only through the teamwork of a "partnered" project and the timely resolution of numerous coordination issues was The Poole and Kent Corporation able to face the challenge of installing the miles of pipe and duct necessary for the completion of this complex project.